# Phase 10.6.4 — Review Workflow Completion & Management Integration

## Objective
Complete the Executive Action Review workflow as a management feature rather than only a persistence proof.

## Delivered

- Controlled review transitions:
  - `open -> reviewed`
  - `open -> deferred`
  - `reviewed -> open` (Reopen)
  - `deferred -> reviewed`
  - `deferred -> open`
- Same-status save remains allowed so leadership notes can be updated without changing workflow state.
- Action Center management summary:
  - total actions
  - open
  - reviewed
  - deferred
  - pending attention
  - completion percentage
  - lifetime audit count
  - latest review activity
- Worklist cards show last review date, reviewer, note preview, and prior operational-day context where available.
- New `Critical only` filter alongside All/Open/Reviewed/Deferred.
- Review page only offers transitions allowed from the current state.
- Reviewed actions show `Reopen` instead of a generic `Open` label.
- Cross-day audit history remains visible when the Executive Summary operational date changes.
- Previous operational-day review context is surfaced without incorrectly carrying the old status into the new day.
- Oracle remains the preferred storage. JSON remains the safe fallback.
- Phase 10.6.3.1 byte-safe Oracle bind guard remains included in the repository baseline.

## New QA endpoint

```text
public/executive-action-review-management-qa.php?hospital=njch
```

Read-only QA is the default.

Controlled reversible write proof:

```text
public/executive-action-review-management-qa.php?hospital=njch&write_test=1&token=YOUR_TOKEN
```

The write proof:

1. Saves a valid status transition.
2. Verifies the changed status.
3. Restores the original status and note.
4. Keeps the Oracle audit rows as permanent evidence.

## PowerShell evidence tool

```powershell
powershell -ExecutionPolicy Bypass -File tools\E16_H1064_Review_Management_QA.ps1 -BaseUrl http://localhost -Hospital njch
```

With controlled write proof:

```powershell
powershell -ExecutionPolicy Bypass -File tools\E16_H1064_Review_Management_QA.ps1 -BaseUrl http://localhost -Hospital njch -WriteTest -Token "YOUR_TOKEN"
```

## Database migration

No new Oracle table or column is required for Phase 10.6.4. It uses:

- `DASH_EXEC_ACTION_REVIEW`
- `DASH_EXEC_ACTION_REVIEW_AUDIT`
- `DASH_EXEC_ACT_REV_AUD_S`

## Expected closing evidence

The preferred closing result contains no `[FAIL]` lines and includes PASS results for:

- Oracle storage
- Review tables ready
- Management summary integrated
- Worklist review metadata
- Critical filter
- Controlled transition matrix
- Cross-day history scope
- Selected action history readback
- Reversible write transition
- Restored original state
- Audit rows added
